Non-Compliance detail


  
Summary
 
Licence number: 721
Annual Return Start: 01 Dec 2022
Annual Return End: 30 Nov 2023
Date Received: 21 Dec 2023
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L2 Load limits The BOD annual discharge load limit of 1525kg was exceeded throughout the monitoring period EPA action determined as part of scheduled inspection program 1